Start your Trading & Investing Journey with us

Join our channel for Daily Free Trades with Live analysis on Youtube, Trade Setup with Important Levels, and Important Stock Market Updates

Sattva Engineering Construction IPO Review - Issue Date, Price, GMP, Subscription, Allotment, Lot Size, and Details

Sattva Engineering Construction IPO : Key Performance Indicators, PE Ratio, EPS, ROE, ROCE & RoNW
The Company Key Performance Indicates the pre-issue EPS of ₹ 7.64 and post-issue EPS of ₹ 5.23 for FY24. The pre-issue P/E ratio is 9.82x, while the post-issue P/E ratio is 14.34x against the Industry P/E ratio is 26x. The company's ROCE for FY24 is 28.58%, ROE for FY24 is 27.10% and RoNW is 27.10%. These metrics suggest that the IPO is fairly priced.

Key Performance Indicator
KPI Values
EPS Pre IPO (Rs.) ₹ 7.64
EPS Post IPO (Rs.) ₹ 5.23
Adjusted 12M EPS Post IPO (Rs.)
P/E Pre IPO 9.82
P/E Post IPO 14.34
Adjusted 12M P/E Post IPO
ROE 27.10 %
ROCE 28.58 %
P/BV 2.20
Debt/Equity 0.83
RoNW 27.10 %
EBITDA Margin
PAT Margin

© 2022 CA Abhay Varn. All Rights Reserved Abhayvarn.com